CDG Fulfillment
Sign in ↗Let's connect
中文
← ALL INSIGHTS

SOURCING & GROWTH / 6 MIN READ

China Product Sourcing RFQ Template: 12 Fields That Make Quotes Comparable

Two supplier quotes can show different unit prices because they describe different jobs. This 12-field RFQ turns scope, cost boundaries and handoff terms into a comparable order ledger.

Conceptual advertising still life: an ivory sourcing quote folds into a parcel while an orange unit-price sticker peels back to reveal layers representing setup, inspection, packaging and freight scope.

A China supplier quote can look cheaper because it covers less. One offer may describe a basic item; another may include a sample, inspection, retail packaging and delivery to a named handoff point. Comparing only unit prices does not compare the same order.

Use a comparable quote ledger: fix product, quantity, acceptance standard, pack-out and delivery boundary in one RFQ before comparing totals. This is an original planning framework, not an industry standard or a promise that every supplier will quote every line.

02

Define one order scenario

State variants and mix, target quantity, packaging recipe, destination or handoff point, and the date the goods need to be ready. If exploring options, ask for separately labeled alternatives. A plain sample is not comparable with a retail-ready set unless both quotes cover the same job.

03

12 fields for a comparable China sourcing RFQ

Copy these into an email or spreadsheet. Mark every field included, excluded or unconfirmed. An empty cell is unknown, not zero.

  1. Product and variants: name, color, size, model, bundle contents and internal SKU. State any needed retail barcode separately; an internal SKU is not automatically a GS1 GTIN.
  2. Specification and revision: material, dimensions, tolerances, finish, function, drawing/photo and a dated revision. Ask which version is priced.
  3. Quantity and price tiers: requested quantity, tier quantities, currency and unit basis (piece, set or carton).
  4. MOQ and lot rules: minimum by design, color, size or production run; whether variants can combine; and whether quantity is a firm minimum or a price break.
  5. Sample, tooling and setup: sample price/time, mold or tooling, artwork/setup charges, any confirmed credit/refund, and ownership/storage of reusable tooling and files.
  6. Quality and acceptance: measurable checks, inspection method, defect definitions, who pays, and agreed remedy if goods fail. “Good quality” is not a pass/fail criterion.
  7. Packaging and pack-out: components, materials, dimensions, print/label requirements, units per set/carton, and whether assembly is included.
  8. Production-time trigger: event starting the clock (for example, deposit plus approved sample/artwork), duration and events that pause it. Separate production from sample approval and freight.
  9. Delivery rule and named point: when using Incoterms®, state exact rule, named place/point and edition, such as “FCA [named place], Incoterms® 2020.”
  10. Freight and destination boundary: included transport and endpoint; export/import, customs, duty, tax, insurance and last-mile charges excluded or unknown. “Shipping included” needs an endpoint.
  11. Currency and payment: currency, deposit/balance milestones, method/fees and event when balance is due.
  12. Validity and change control: expiry, assumptions that trigger repricing, how spec/quantity changes are handled, and discrepancy contact.
04

Compare scope before totals

Use one column per supplier and one row per field. Align the same specification revision, quantity, pack-out, acceptance criteria and delivery point. Keep buckets for production; one-time sample/setup; inspection; packaging/assembly; transport to the named point; destination charges outside the quote; and known payment/currency costs.

Comparable order cash requirement = quoted production + confirmed one-time charges + confirmed inspection and pack-out + confirmed transport + separately identified destination and payment items

Keep estimated and unknown amounts on their own lines. Do not silently add assumed freight or duty to one offer and compare it with another supplier’s firm quote. For an accepted-unit view, divide confirmed costs by expected accepted, sellable units and record the acceptance assumption; the formula cannot fill missing scope.

Symbolic example, not a supplier result

Supplier A has base unit price pA, but tooling tA and retail packing kA are excluded. Supplier B includes agreed pack-out but excludes destination import cost dB. At quantity q, compare:

  • A: q × pA + tA + kA + separately confirmed transport and other charges
  • B: q × pB + separately confirmed charges, with dB listed separately as unknown or buyer-side

These are placeholders, not prices. When missing lines are priced, either supplier may be cheaper or the quotes may still be incomparable.

05

Use Incoterms precisely

The International Chamber of Commerce explains that Incoterms® rules allocate buyer/seller obligations, delivery risk and specified costs. They do not set product specifications, price, payment terms, tariffs or the whole sale contract. Treat the rule as one delivery boundary, not a substitute for the rest of the RFQ.

When relevant, write the rule, named place and edition together and confirm the handoff and charges meant by the supplier. Ask a qualified trade or legal professional about contract language, customs treatment or tax questions where needed.

06

Copyable RFQ brief

Product / internal SKU and variants:

Specification revision, material, size and tolerances:

Reference drawing or photos:

Requested quantity and price tiers:

MOQ by variant / color / design:

Sample, tooling, artwork and setup charges:

Quality checks and acceptance criteria:

Packaging recipe and carton details:

Ready date and production-time trigger:

Delivery rule, named point and edition (if applicable):

Included transport / excluded destination costs:

Currency, payment milestones and quote-valid-through date:

Mark each line included, excluded or unconfirmed.

Attach a drawing/photo if details matter and version the request. If a dimension, material, insert or quantity changes, ask the supplier to reconfirm affected lines rather than assuming the old total still applies.

07

Before approving a quote

  • Suppliers priced the same dated spec and variant mix.
  • Quantity and MOQ use the same basis.
  • Samples, tooling, inspection, packaging and assembly are separate.
  • Acceptance criteria can be observed and checked.
  • Production time starts from a named event.
  • Delivery terms name a precise place and edition when applicable.
  • Freight, import costs, taxes and last mile are included, excluded or unknown.
  • Payment timing, currency, validity and change conditions are clear.
  • Each material unknown has an owner and answer before deposit.

This does not guarantee a lower price or prevent every production issue. It makes the choice traceable: you can see what each quote covers, what is outside it and what needs an answer before ordering.

For help turning a product brief into a sourcing and fulfillment workflow, review DropFillShip sourcing services or contact the team. Share specifications, variant mix, quantity, packaging, destination and target date; leave sensitive credentials out.

Primary references

This field list and ledger are original editorial analysis. No real supplier, quote, price or savings result is claimed; the symbolic example is hypothetical.

Talk to our team